Emerald 205 6 7 8 9
Emerald_205_6_7_8_9
Emerald_017_18_19_20_21
Emerald_032_3_4_5_6
Emerald_088
Emerald_097
Emerald_132
Emerald_200_1_2_3_4
Emerald_215_6_7_8_9
Emerald_210_1_2_3_4
Emerald_241_2_3_4_5
Emerald_125
Emerald_220_1_2_3 1_3
Emerald_004
Emerald_121
Emerald_251_2_3_4_5

Client:
Emerald Technology

Date:
July 2011

We helped global technology recruitment specialists Emerald Technology complete their move into Innovation Court in Birmingham. Every aspect of this scheme was carefully considered to ensure that space met the exacting brief from the client. Products were selected for their BREEAM A+ rating where possible, and furniture was specified from manufacturers offering ‘cradle to cradle’ products. A sustainable workplace can be specified and delivered at a relatively low cost, and the final result speaks for itself.

“The level of professionalism from the whole company was fantastic and attention to detail was second to none. We had a few challenges along the way but were guided and assisted by Eos on every occasion and they could not have been more helpful or understanding of our needs. The results speak for themselves and we are delighted with our new office environment and have enjoyed working with everyone at Eos immensely.”
Alison Bosworth, Operations Manager, Emerald.