Eos Watchmoor Claudius 001 1 2 Fused Final
Eos_Watchmoor_Claudius_001_1_2_fused_final
Eos_Watchmoor_Claudius_010_1_2_final
Eos_Watchmoor_Claudius_013_4_5_final
Eos_Watchmoor_Claudius_016_final
Eos_Watchmoor_Claudius_018_final
Eos_Watchmoor_Claudius_036_final
Eos_Watchmoor_Claudius_037_final
Eos_Watchmoor_Claudius_063_4_5_final
Eos_Watchmoor_Claudius_070_2_3_final
Eos_Watchmoor_Claudius_074_final
Eos_Watchmoor_Claudius_078_final
Eos_Watchmoor_Claudius_086_final
Eos_Watchmoor_Claudius_087_final

Client:
Watchmoor Park

Date:
August 2012

This 12,000ft2  Category A and Category B combined fit out encompassed every aspect of interior design and fit out under a Design and Build contract. We designed all of the heating ventilation and cooling as well as digital programmable LG7 lighting.

Metal suspended ceilings and plasterboard margins and metal stud partitions were all installed as part of this fast track fit out. All of the power and data has been concealed within the new raised access computer floor allowing for future flexibility.